Facilities Managers Development Group

January 14, 2009

ICTAS- Corporate Research Center

 

Meeting Opened By: Dawn Maxey

Guest Speaker: Mike Coleman, Associate VP for Facilities

 

 

Business Discussed:

 

Mike Coleman, Associate VP for Facilities spoke with the FMDG group about Virginia Tech’s Energy and Sustainability policies.  Below are the key points that were discussed by Mr. Coleman during the meeting.

 

·         Policy 5505 – Campus Energy and Water Policy was established in September 2006.  http://www.policies.vt.edu/5505.pdf

·         The space temperatures reflected in Policy 5505 are the exact same direction provided by the State’s for all state facilities.

·         Policy 5505 is however pending final approval for revisions (enhancements) made through several months of work by a subcommittee formed under the Energy/Sustainability Committee last school year.  The end product was then reviewed and approved this school year by the Energy committee.  The sub-committee chair for this task was Dr. Annie Pearce from the Department of Building Construction.   

·         The changes pending for Policy 5505 reflect the committees focus to encompass sustainability as a whole for the university as we continually challenge the university’s environmental footprint. 

·         This is a web link if anyone wants to see what is happening with the Energy/Sustainability committee.  http://www.facilities.vt.edu/sustainability/energy.asp  

·         Facilities Services absolutely need to know of any research space that has special HVAC requirements that are essential to the research materials and the equipment. 

·         Facilities Services would ask all facility managers or department heads with these critical research needs to identify these rooms, their buildings, and most importantly what their HVAC environmental parameters are so we can: 1) make sure the HVAC control system has been set up and programmed properly, 2) make sure the HVAC equipment has been designed to accommodate the research needs, 3) make sure our response protocols for these spaces are appropriate.

 

 

After Mr. Coleman, Dawn and Lylah discussed up coming meetings and the FMDG schedule. Please see the FMDG website to view the current list of presenters for the FMDG meetings.

 

 

Meeting Adjourned

Next Meeting: February 11, 2009 – ICTAS- Corporate Research Center

Presentation By: Lynn Eichhorn- Physical Plant Planning, Construction & Design